The London Palladium - Outstanding feature stair at the world famous 

Spiral Construction has just completed a stunning new feature staircase for the world famous London Palladium theatre.

Working in conjunction with the main contractor Overbury and RHWL Architects, Spiral were commissioned to design, manufacture and install a helical staircase to link the newly refurbished Palladium bar with the foyer. The exact detailing of the traditional design was critical to match in with period features of the building. Spiral produced highly detailed 3D models of the stair using state of the art CAD technology in order to make sure that even the smallest details were exactly what were required.

The sweeping stair consisted of a steel structure with the stringers and soffit clad in fibrous plaster. The natural stone treads and risers were specially machined to reproduce the detailed profiles matching those of existing Victorian staircases within the building, with a soft beige coloured Italian marble the preferred material. The balustrade to the stair and adjacent circular gallery comprised glass and wrought iron spindles, again to match parts of the building, with a French polished hardwood handrail. The variety of materials together with the highly detailed design combined to produce a stunning staircase which many visitors have commented looks as if it has been in place for decades than a few weeks.

Much of the work was directly supervised by Lord Andrew Lloyd Webber, Chairman and owner of the Really Useful Group who own the Palladium along with a number of other leading West End theatres.

Spiral Construction Managing Director Eric Nicholls commented "We are delighted to have been involved in such a prestigious project and the feedback that we have received from all parties involved has been excellent. The timescale to complete the work was particularly challenging as we could not carry out any surveys on the existing structure until Sister Act, the last show prior to the shut down, had finished its run, and the work was further disrupted when the theatre had to reopen in the middle of the works for the Royal Variety Performance. Despite all this, work was completed on programme in readiness for the grand reopening for the Wizard of Oz starring Michael Crawford. The fitters had to co-ordinate any noisy operations around the final rehearsals for the show!"

Spiral Construction has recently completed a £600,000.00 factory extension and recruited 3 new members of staff bring the total workforce to 61. Other currently high profile contracts include the design and supply of a feature curved staircase to the recently completed Heron Tower, currently London’s tallest building.

BABRAHAM CAMPUS

Spiral have recently completed two spectacular external helical staircases for Babraham Science Park near Cambridge, working with Kier Construction and Archial Architects. 

The stairs feature sweeping horizontal balustrading with stainless steel handrails and feature inset LED lighting, ...

READ MORE

SPIRAL APPEAR ON COUNTRYFILE!

One of Spiral's more unusual projects recently appeared on BBC flagship programme Countryfile, when presenter Adam Henson reported on the latest developments from the Met Office in accurately forecasting rain.

READ MORE

"HELICAL MASTERPIECE" ON GRAND DESIGNS

Spiral UK featured on Channel 4’s highly acclaimed Grand Designs programme again. Kevin McCloud, made specific mention of Spiral UK’s stunning central spiral staircase, calling it a “helical masterpiece”.

Located in the heart of the Jersey property, nominated for ...

READ MORE