Green Park, Reading

Green Park is a 79 hectare business park in Reading, Berkshire, developed by Prudential and adjacent to the Madejski Stadium.

We were commissioned by ISG Fit Out for a refurbishment project at offices on South Oak Way. ISG selected us for our exceptional experience in working on office fit outs. The helical staircase formed a ground floor feature in the offices entrance area.

Green Park Reading scaled

Project

450 South Oak Way, Green Park, Reading

Requirement

Helical Staircase

Client

Oxford Properties

Architect

Barr Gazetas

Contractor

ISG Fit Out

Floor to floor height

4235mm

Risers

24 @ 176.5mm closed

Tread Type

stone clad with closed riser

Tread Width

1150mm

Balustrade

Outer: radiused toughened glass, Inner: RHS uprights with flat bar top and intermediate rails then clad with boarding to form curved wall.

Stringer

Outer: fabricated channel approx. 300mm x 50mm, Inner: approx. 300mm x 12mm

Handrails

50mm diameter polished stainless steel

Helical entrance stair

This helical staircase design was built to provide an elegant, well-designed showpiece, while also providing office stairs that were practical, robust and easy to maintain. The stair was fabricated from mild steel with closed risers and stone treads.