Feature helical / curved staircase for Alphabeta building

Sleek, helical / curved staircase installed at the Alphabeta Building.

This fantastic feature helical was produced by Spiral UK for Collins Construction PLC who were wanting to install a structure that could connect the 8th and 9th floors of the Alphabeta building in Moorgate, London.

The inspiration behind this feature came mostly from it’s surroundings and the location of which the staircase was intended to be installed. Bringing in the white framing from the simplistic, sleek white surrounding walls with pops of vibrant colour under the treads to match the accents around the area, with the timber wooden treads designed to match the interior wooden flooring to give the effect of a seamless flow.

helical staircase designers

Spiral UK were the principle project leads with the design and construction of the piece, taking charge of ensuring the structure was a striking and complimentary feature to this building. Once designed and manufactured, it was up to both Spiral’s and Collins Construction’s installation teams to work together to fit this structure in a 7 day window.

Spiral UK took charge of the process of ensuring the planning of the procedure, as well as overseeing the risk assessments and health and safety of the job. This project saw Spiral working with local traffic management systems to ensure all the plants and equipment were able to effectively get in and do their jobs.

This project was a great success and one that everyone involved was pleased to be part of. The staircase was in use by the users of the building within in the week and decorated just in time for the Christmas season.

Project

Alphabeta Building, Moorgate, London

Requirement

A feature helical / curved staircase to connect the 8th and 9th floors.

Materials

Metal, Steel, timber treads and white gloss finishing

Contractor

Collins Construction PLC

Managing a feature staircase installation in busy London. 

When working with the fit out sector, Spiral UK understands that there will be time constraints, pressures and urgencies, and this helical feature was no different.

Spiral UK were masterful in their approach, communicating effectively with Collins Construction to ensure all procedures were in place and understood by all involved.

This feature helical needed to be up and usable within a 7 day window, which meant pulling a lot of strings and organising many different elements in a busy area around London.

However, due to Spiral UK’s years of experience in the trade and working to suit fit out sector needs, they were able to provide a staircase and a service that met the demands to a satisfying quality.